[Neutron] J-PARC Project Newsletter No.93, January 2024

kyoko.aizawa at j-parc.jp kyoko.aizawa at j-parc.jp
Tue Jan 30 01:43:22 CET 2024


★☆━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ 
  J-PARC Project Newsletter
                         No.93, January 2024  
Japan Proton Accelerator Research Complex under joint operation by 
the High Energy Accelerator Research Organization (KEK) and the 
Japan Atomic Energy Agency (JAEA)                                                                               
http://j-parc.jp/index-e.html                                                                              
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━☆★

HEADLINES AND CONTENTS
1. [Overview]
・MID-TERM EVALUATION BY MEXT OF THE ENTIRE J-PARC 
・BEAM OPERATION RESTARTED AFTER APPLYING SAFETY MEASURES TO AVOID 
RECURRENCE OF THE FIRE
・MR/NU ACHIEVED CONTINUOUS OPERATION AT THE INITIAL DESIGN POWER OF 
760KW
・PROF. ICHIKAWA (TOHOKU U.) RECEIVES THE NISHINA MEMORIAL PRIZE FOR 
ADVANCING NEUTRINO OSCILLATIONS WITH THE T2K EXPERIMENT
・J-PARC’S PUBLIC LECTURE 2023 “THE 'MUONS FOR THE FUTURE: SEEING 
THE INVISIBLE!” WAS HELD
https://j-parc.jp/c/en/topics/2024/01/26001281.html#overview

2. [Accelerator Division]
BEAMS WITH A POWER OF 760 kW, A NEW RECORD AT THE MR, REACHED THE 
NEUTRINO FACILITY FOR BEAM USER OPERATION
https://j-parc.jp/c/en/topics/2024/01/26001281.html#ACC

3. [Particle and Nuclear Physics Division]
BREAKTHROUGH SUCCESSES FOR THE BEAM AND THE NEAR DETECTOR(ND).
STATUS OF THE JSNS2 / JSNS2-II (SEARCH FOR STERILE NEUTRINOS AT 
J-PARC MLF, E56 / E82).
WORKSHOP ON “COMPLEMENTARITY OF J-PARC AND HEAVY ION COLLISION 
EXPERIMENTS”.
STATUS OF THE COHERENT MUON TO ELECTRON TRANSITION (COMET).
STATUS OF THE MUON g-2/ ELECTRIC DIPOLE MOMENT (EDM) (E34).
https://j-parc.jp/c/en/topics/2024/01/26001281.html#NU

4. [Materials and Life Science Division]
USER PROGRAM STARTED WITH A 12 DAYS DELAY AND LESS BEAM POWER.
PROPOSALS FOR 2024A PERIOD WERE RECEIVED.
TRAINING SCHOOL ON SAMPLE ENVIRONMENT AND WORKSHOP ON NEUTRON 
IMAGING WERE HELD.
INTERNATIONAL COMMUNICATION WITH LEADING MUON FACILITIES.
https://j-parc.jp/c/en/topics/2024/01/26001281.html#MLF

5. [Nuclear Transmutation Division]
PLANS FOR NUCLEON ENGINEERING FACILITY WERE LISTED IN THE PROPOSAL 
OF THE SCIENCE COUNCIL OF JAPAN
https://j-parc.jp/c/en/topics/2024/01/26001281.html#ADS

6. [Safety Division]AN EMERGENCY DRILL HELD ASSUMING A FIRE ACCIDENT.
FACILITY INSPECTION SUCCESSFULLY COMPLETED.
https://j-parc.jp/c/en/topics/2024/01/26001281.html#Safety

┏----…----…----…----…----…----…----…----…----…----…----…----…☆
┃ Editorial Board:
┃ Hidetomo OGURI (Chair) : oguri.hidetomo[at]jaea.go.jp
┃ Katsuhiro SHINTO: shinto.katsuhiro[at]jaea.go.jp
┃ Kyoichiro OZAWA: ozawa[at]post.kek.jp
┃ Kyoko AIZAWA: akyouko[at]post.j-parc.jp
┃ Hayanori TAKEI: takei.hayanori[at]jaea.go.jp
┃ Jean-Michel POUTISSOU (English Editor): jmp[at]triumf.ca
┃ Chiaki SHIRAISHI (Secretary): shiraishi.chiaki[at]jaea.go.jp
┃ * Please replace "(at)" with "@" when you enter an email address.
★----…----…----…----…End of Letter…----…----…----…----…----




More information about the Neutron mailing list